In setup Priority: High Defence-Restricted AS9100 traveller
Mitchell & Cheesman · Job Traveller
J-26-1015
Controlled document
AS9100 evidence record · Do not remove from job folder
Customer
Boeing Defence Australia
Aerospace
Customer PO
BOE-PO-DA-2287
Due date
29 May 2026
10d to go
Qty
3
Part number
BOE-DA-66108
Engine pylon link
Material spec
IN-718
Inconel 718 bar (AMS 5662)
Progress
5% complete · 0.0 / 0.0 hrs
Operations & sign-offs
Every operation captured digitally. Every sign-off timestamped.
| Op | Operation | Machine | Setter | Operator | Est h | Act h | Signed-off / at | Status |
|---|
QA checklist · final release
First article inspection (FAI) report completed
Awaiting sign-off
Material certification on file (batch MB-26-0128)
A. Kowalski (Quality)
Dimensional report — CMM verified
Awaiting sign-off
Surface finish to specification
Awaiting sign-off
Visual inspection — burrs, scratches, damage
Awaiting sign-off
Customer-specific packaging requirements
Awaiting sign-off
Final certificate of conformance signed
Awaiting sign-off
Material batch traceability
Time entries · recent
No time entries yet.
Audit trail · this job
Full audit log → 13 May 2026 · 14:00 Created by Daniel Reinhardt
19 May 2026 · 06:15 Last modified by James Mitchell