Job J-26-1012

Raytheon Australia · RAY-M-55021 Rev D · Qty 6

AS9100 · Audit-ready
QA Priority: High Defence-Restricted AS9100 traveller
← Back
Mitchell & Cheesman · Job Traveller
J-26-1012
Controlled document
AS9100 evidence record · Do not remove from job folder
Customer
Raytheon Australia
Defence
Customer PO
RAY-PO-M-7711
Due date
20 May 2026
1d to go
Qty
6
Part number
RAY-M-55021
Missile guidance housing
Drawing rev
D
View drawing →
Material spec
IN-718
Inconel 718 bar (AMS 5662)
Material batch
MB-26-0128
Cert SHP-IN-4456 →
Progress
90% complete · 16.0 / 17.5 hrs
Operations & sign-offs
Every operation captured digitally. Every sign-off timestamped.
Op Operation Machine Setter Operator Est h Act h Signed-off / at Status
10 Material prep James Mitchell Greg Ashworth 1.0 1.0
James Mitchell
12 May 2026 · 09:00
Complete
20 Op 1 — 5-axis rough MI-200 James Mitchell Tom Halliday 6.0 5.5
James Mitchell
14 May 2026 · 14:00
Complete
30 Op 2 — 5-axis finish MI-200 James Mitchell Tom Halliday 5.0 4.7
James Mitchell
16 May 2026 · 16:00
Complete
40 Heat treatment (subcontract) 3.0 3.0
Mark Petrenko
18 May 2026 · 10:00
Complete
50 CMM dimensional CMM-G Olivia Brennan 2.0 1.8
Olivia Brennan
19 May 2026 · 08:00
Complete
60 Final QA sign-off Anna Kowalski 0.5 Pending In progress
QA checklist · final release
First article inspection (FAI) report completed
A. Kowalski (Quality)
Material certification on file (batch MB-26-0128)
A. Kowalski (Quality)
Dimensional report — CMM verified
O. Brennan (Quality)
Surface finish to specification
O. Brennan (Quality)
Visual inspection — burrs, scratches, damage
A. Kowalski (Quality)
Customer-specific packaging requirements
Awaiting sign-off
Final certificate of conformance signed
Awaiting sign-off
Material batch traceability
Batch consumed
MB-26-0128
IN-718 · Cert SHP-IN-4456
View cert PDF →
Other jobs from this batch
  • J-26-1015 Boeing Defence Australia · BOE-DA-66108 · Qty 3
    In setup
  • J-26-1008 Airbus Australia Pacific · AAP-AC-99012 · Qty 6
    Running
Time entries · recent
No time entries yet.
Audit trail · this job
Full audit log →
04 May 2026 · 11:00 Created by Daniel Reinhardt
19 May 2026 · 08:30 Last modified by Anna Kowalski
12 May 2026 · 09:00 Op 10 signed off by James Mitchell · Material prep
14 May 2026 · 14:00 Op 20 signed off by James Mitchell · Op 1 — 5-axis rough
16 May 2026 · 16:00 Op 30 signed off by James Mitchell · Op 2 — 5-axis finish