Complete Priority: High Defence-Restricted AS9100 traveller
Mitchell & Cheesman · Job Traveller
J-26-1024
Controlled document
AS9100 evidence record · Do not remove from job folder
Customer
Raytheon Australia
Defence
Customer PO
RAY-PO-M-7700
Due date
06 May 2026
-13d to go
Qty
6
Part number
RAY-M-55028
Seeker gimbal arm
Material spec
IN-718
Inconel 718 bar (AMS 5662)
Progress
100% complete · 0.0 / 0.0 hrs
Operations & sign-offs
Every operation captured digitally. Every sign-off timestamped.
| Op | Operation | Machine | Setter | Operator | Est h | Act h | Signed-off / at | Status |
|---|
QA checklist · final release
First article inspection (FAI) report completed
A. Kowalski (Quality)
Material certification on file (batch MB-26-0144)
A. Kowalski (Quality)
Dimensional report — CMM verified
O. Brennan (Quality)
Surface finish to specification
O. Brennan (Quality)
Visual inspection — burrs, scratches, damage
A. Kowalski (Quality)
Customer-specific packaging requirements
P. Anand (Admin)
Final certificate of conformance signed
A. Kowalski (Quality)
Material batch traceability
Other jobs from this batch
This is the only job that consumed this batch.
Time entries · recent
No time entries yet.
Audit trail · this job
Full audit log → 20 Apr 2026 · 09:30 Created by Daniel Reinhardt
06 May 2026 · 11:00 Last modified by Anna Kowalski