Job J-26-1019

Sentinel Marine · SEN-MAR-12 Rev A · Qty 10

AS9100 · Audit-ready
Complete Priority: Normal Defence-Restricted AS9100 traveller
← Back
Mitchell & Cheesman · Job Traveller
J-26-1019
Controlled document
AS9100 evidence record · Do not remove from job folder
Customer
Sentinel Marine
Industrial
Customer PO
SEN-PO-0099
Due date
15 May 2026
-4d to go
Qty
10
Part number
SEN-MAR-12
Marine driveshaft coupling
Drawing rev
A
View drawing →
Material spec
4140-PHT
4140 Pre-Hardened Tool Steel
Material batch
MB-26-0135
Cert AS-119103-26 →
Progress
100% complete · 0.0 / 0.0 hrs
Operations & sign-offs
Every operation captured digitally. Every sign-off timestamped.
Op Operation Machine Setter Operator Est h Act h Signed-off / at Status
QA checklist · final release
First article inspection (FAI) report completed
A. Kowalski (Quality)
Material certification on file (batch MB-26-0135)
A. Kowalski (Quality)
Dimensional report — CMM verified
O. Brennan (Quality)
Surface finish to specification
O. Brennan (Quality)
Visual inspection — burrs, scratches, damage
A. Kowalski (Quality)
Customer-specific packaging requirements
P. Anand (Admin)
Final certificate of conformance signed
A. Kowalski (Quality)
Material batch traceability
Batch consumed
MB-26-0135
4140-PHT · Cert AS-119103-26
View cert PDF →
Other jobs from this batch
This is the only job that consumed this batch.
Time entries · recent
No time entries yet.
Audit trail · this job
Full audit log →
01 May 2026 · 09:00 Created by Daniel Reinhardt
15 May 2026 · 16:00 Last modified by Anna Kowalski