Job J-26-1018

Adelaide Pump Services · APS-44 Rev A · Qty 4

AS9100 · Audit-ready
Scheduled Priority: Low Defence-Restricted AS9100 traveller
← Back
Mitchell & Cheesman · Job Traveller
J-26-1018
Controlled document
AS9100 evidence record · Do not remove from job folder
Customer
Adelaide Pump Services
Industrial
Customer PO
APS-PO-220
Due date
05 June 2026
17d to go
Qty
4
Part number
APS-44
Pump impeller shaft
Drawing rev
A
View drawing →
Material spec
17-4PH
17-4 PH Stainless H900
Material batch
MB-26-0133
Cert AWM-2026-810 →
Progress
0% complete · 0.0 / 0.0 hrs
Operations & sign-offs
Every operation captured digitally. Every sign-off timestamped.
Op Operation Machine Setter Operator Est h Act h Signed-off / at Status
QA checklist · final release
First article inspection (FAI) report completed
Awaiting sign-off
Material certification on file (batch MB-26-0133)
A. Kowalski (Quality)
Dimensional report — CMM verified
Awaiting sign-off
Surface finish to specification
Awaiting sign-off
Visual inspection — burrs, scratches, damage
Awaiting sign-off
Customer-specific packaging requirements
Awaiting sign-off
Final certificate of conformance signed
Awaiting sign-off
Material batch traceability
Batch consumed
MB-26-0133
17-4PH · Cert AWM-2026-810
View cert PDF →
Other jobs from this batch
  • J-26-1009 Airbus Australia Pacific · AAP-AC-99055 · Qty 18
    In setup
  • J-26-1022 Thales Australia · THA-B-44102 · Qty 12
    Complete
Time entries · recent
No time entries yet.
Audit trail · this job
Full audit log →
14 May 2026 · 10:00 Created by Hayley Foster
14 May 2026 · 10:00 Last modified by Hayley Foster