Job J-26-1017

ASC Pty Ltd · ASC-S-91002 Rev B · Qty 6

AS9100 · Audit-ready
Scheduled Priority: Normal Defence-Restricted AS9100 traveller
← Back
Mitchell & Cheesman · Job Traveller
J-26-1017
Controlled document
AS9100 evidence record · Do not remove from job folder
Customer
ASC Pty Ltd
Defence
Customer PO
ASC-PO-19001
Due date
12 June 2026
24d to go
Qty
6
Part number
ASC-S-91002
Submarine valve body
Drawing rev
B
View drawing →
Material spec
316L
316L Stainless bar
Material batch
MB-26-0134
Cert AS-119088-26 →
Progress
0% complete · 0.0 / 0.0 hrs
Operations & sign-offs
Every operation captured digitally. Every sign-off timestamped.
Op Operation Machine Setter Operator Est h Act h Signed-off / at Status
QA checklist · final release
First article inspection (FAI) report completed
Awaiting sign-off
Material certification on file (batch MB-26-0134)
A. Kowalski (Quality)
Dimensional report — CMM verified
Awaiting sign-off
Surface finish to specification
Awaiting sign-off
Visual inspection — burrs, scratches, damage
Awaiting sign-off
Customer-specific packaging requirements
Awaiting sign-off
Final certificate of conformance signed
Awaiting sign-off
Material batch traceability
Batch consumed
MB-26-0134
316L · Cert AS-119088-26
View cert PDF →
Other jobs from this batch
  • J-26-1007 Thales Australia · THA-B-44211 · Qty 10
    Scheduled
Time entries · recent
No time entries yet.
Audit trail · this job
Full audit log →
16 May 2026 · 10:00 Created by Hayley Foster
16 May 2026 · 10:00 Last modified by Hayley Foster