Job J-26-1016

CEA Technologies · CEA-R-22001 Rev A · Qty 24

AS9100 · Audit-ready
Running Priority: Normal Defence-Restricted AS9100 traveller
← Back
Mitchell & Cheesman · Job Traveller
J-26-1016
Controlled document
AS9100 evidence record · Do not remove from job folder
Customer
CEA Technologies
Defence
Customer PO
CEA-PO-R-9911
Due date
22 May 2026
3d to go
Qty
24
Part number
CEA-R-22001
Phased-array radar manifold
Drawing rev
A
View drawing →
Material spec
6061-T6
6061-T6 Aluminium bar
Material batch
MB-26-0118
Cert AS-118842-26 →
Progress
70% complete · 0.0 / 0.0 hrs
Operations & sign-offs
Every operation captured digitally. Every sign-off timestamped.
Op Operation Machine Setter Operator Est h Act h Signed-off / at Status
QA checklist · final release
First article inspection (FAI) report completed
Awaiting sign-off
Material certification on file (batch MB-26-0118)
A. Kowalski (Quality)
Dimensional report — CMM verified
Awaiting sign-off
Surface finish to specification
Awaiting sign-off
Visual inspection — burrs, scratches, damage
Awaiting sign-off
Customer-specific packaging requirements
Awaiting sign-off
Final certificate of conformance signed
Awaiting sign-off
Material batch traceability
Batch consumed
MB-26-0118
6061-T6 · Cert AS-118842-26
View cert PDF →
Other jobs from this batch
  • J-26-1004 Nova Systems · NOV-77821 · Qty 30
    Running
Time entries · recent
No time entries yet.
Audit trail · this job
Full audit log →
07 May 2026 · 13:00 Created by Daniel Reinhardt
19 May 2026 · 09:00 Last modified by Sarah Nguyen