Job J-26-1014

Boeing Defence Australia · BOE-DA-66103 Rev B · Qty 12

AS9100 · Audit-ready
Running Priority: Normal Defence-Restricted AS9100 traveller
← Back
Mitchell & Cheesman · Job Traveller
J-26-1014
Controlled document
AS9100 evidence record · Do not remove from job folder
Customer
Boeing Defence Australia
Aerospace
Customer PO
BOE-PO-DA-2287
Due date
27 May 2026
8d to go
Qty
12
Part number
BOE-DA-66103
Wing rib component
Drawing rev
B
View drawing →
Material spec
7075-T651
7075-T651 Aluminium plate
Material batch
MB-26-0120
Cert AWM-2026-771 →
Progress
35% complete · 0.0 / 0.0 hrs
Operations & sign-offs
Every operation captured digitally. Every sign-off timestamped.
Op Operation Machine Setter Operator Est h Act h Signed-off / at Status
QA checklist · final release
First article inspection (FAI) report completed
Awaiting sign-off
Material certification on file (batch MB-26-0120)
A. Kowalski (Quality)
Dimensional report — CMM verified
Awaiting sign-off
Surface finish to specification
Awaiting sign-off
Visual inspection — burrs, scratches, damage
Awaiting sign-off
Customer-specific packaging requirements
Awaiting sign-off
Final certificate of conformance signed
Awaiting sign-off
Material batch traceability
Batch consumed
MB-26-0120
7075-T651 · Cert AWM-2026-771
View cert PDF →
Other jobs from this batch
  • J-26-1002 BAE Systems Australia · BAE-P-30115-B · Qty 8
    In setup
  • J-26-1001 BAE Systems Australia · BAE-P-30024-A · Qty 12
    Running
Time entries · recent
No time entries yet.
Audit trail · this job
Full audit log →
11 May 2026 · 11:00 Created by Daniel Reinhardt
19 May 2026 · 08:00 Last modified by Sarah Nguyen